Do you want your borehole to last for many years? Do you want a sustainable yield? Then a borehole Capacity Testing or Yield Test is recommended.


What is a Borehole Capacity or Yield Test?

A yield test involves a test to see the balance between the maximum amount of water that can be pumped out of the borehole and the amount of water that recharges back from the surrounding ground water source.

There are a number of aspects that need to be taken into consideration when testing a borehole. There are two important rules that need to be kept in mind when determining the sustainable yield i.e. The total abstraction from the borehole should be less than the natural groundwater recharge, secondly, a borehole should be pumped in such a manner that the water level never reaches the position of the main water strike (normally associated with a fracture). 
Borehole Capacity Testing with Borehole Experts Zimbabwe
Borehole Capacity Testing with Borehole Experts Zimbabwe
Should this happen the yield will inevitably be affected and the borehole will eventually dry up.

Why Carry Out Capacity Test?

Test pumping boreholes is normally carried out to meet two main objectives:
  1. To establish borehole potential. To estimate the sustainable yield and hydraulic performance of individual boreholes for water supplies.
  2. To establish aquifer potential. To assess the hydraulic characteristics of the aquifer to determine the groundwater resources.

How do we Carry Out Capacity Test?

Test pumping consists of pumping a borehole at a specified rate and recording the level (and therefore the draw-down) in the pumping well, as well as any nearby observation boreholes at specific time intervals. When these measurements are substituted in appropriate flow equations, certain hydraulic parameters can be calculated. These parameters, together with qualitative assessment of discharge-drawdown characteristics, are then used for the assessment of a recommended yield of the boreholes and or aquifers.

Step Test

During this test the pump rate is increased in steps at regular intervals. For example a borehole may be pumped at a rate of 1000l/hr for a period of 1 hour and increased thereafter to a rate of say 2000l/hr for the next hour and so on for several more steps. This type of test is particularly useful to determine the effectiveness of the borehole, but not useful in determining the long term sustainable yield of a borehole. In this regard the constant rate test is more useful.

Constant Rate Test

In the Constant Rate Test (CTR), the borehole is pumped at a constant discharge rate over a period ranging from 8 – 48 hours (or longer) – the length of the test is normally proportional to the expected yield and importance of the borehole. The discharge is kept constant for the duration of the test and water levels are recorded in the pumping boreholes as well as observation boreholes (if any). The time-drawdown data obtained from the CRT is then analyzed. The analysis provides useful input to assess the sustainable yield of individual boreholes and the potential of aquifers. Hydro-geologists are trained to utilize different mathematical equations to estimate a sustainable yield.

Recovery Test

In this test, recovering water levels are measured in the pumping borehole immediately after the CRT, when the pump is switched off. This recovery test is very useful in assessing the pumping effect and possible dewatering of the aquifers that may result due to the limited extent of an aquifer.

Furthermore the recovery test will indicate the level to which the aquifer is actually dewatered by measuring the residual drawdown after the borehole was allowed to recover

Costs

In many cases the continuous over pumping of a borehole will lead to the eventual complete failure of the borehole, resulting in a requirement to have the borehole re-drilled, this is far more expensive than having the borehole tested on a regular basis to ensure a sustainable yield.

Water Quality

An important aspect of a borehole yield test is the monitoring of the water quality as pumped from the borehole. A water sample is generally taken at the start of the test as well as at the end of the test for full chemical analysis, while the electrical conductivity and temperature is normally monitored with the water level for the duration of the test.

This information assists in understanding the aquifer behavior e.g. are we abstracting some of the older water from the deeper formations or does the aquifer yield sufficient fresh water quantities.

The determination of sustainable yield will normally take this information into account. The water quality is also important to determine whether it is suitable for domestic, irrigation or industrial purposes. An example of this importance from domestic purposes is the nitrate content of the water. 

The maximum allowable is 10mg/l. Too much nitrate has a major impact on infants less than 6 months old and leads to a condition called methemoglobinemia (blue-baby syndrome) and could be fatal. 

Hydro-geologists are specifically trained to apply the science of hydro-geology in terming the sustainable yield of a boreholes and could assist in reducing your risk of borehole and pump failures as well as optimizing the operational costs.


For All Your Borehole Drilling Services Contact Us:


Five Facts About Borehole Drilling That You Need To Take Note Of:

1. Know Your Borehole Casings:The Preferred Borehole Casing In Zimbabwe Is Class 9 and 10 (Pressure Classes.)This is because Class 9 and Class 10 Casings are more collapse resistant. The strength of a Casing is often described as collapse resistance.

2. Borehole Drilling Depth: The exact depth, of where the water is located, cannot be established by the drilling contractor nor the Water Surveyor (Borehole Siter).

3. The Is No 100% Guarantee On Water: It is important to note that it is never a 100% guarantee that any hole will yield water, the amount and water quality can also not be guaranteed by the drilling contractor and water surveyor.

4. Borehole Siting or Water Surveying Is Important: Making use of a hydrologist or traditional water diviner will increase your chances of having a successful borehole that will yield a sufficient amount of water.

5. Know The Risks: The risk of the borehole drilling lies with the property owner. The client will still be liable for the drilling costs irrespective of a borehole yielding water or not.

The Cost or Prices For Borehole Drilling in Zimbabwe:


1. Siting: $100.00USD
2. Drilling and Casing: (40 Metres) $1300.00USD - (Using Class 6)
3. AC Electrical Installation: $1000.00USD
4. Solar Pump Installation: $1400.00USD
5. Extra Metres After 40 Metres: USD $45.00USD per metre.
6. 5000 Litre Tank and 4 metre Tank Stand: $1000.00USD
7. Stuck Pump Fishing Out: $180.00USD
8. Capacity Testing: $250.00USD

- Casing with Class 9 Casing incurs an additional $200.00USD.
- Double Casing: $20.00USD per metre.

Note this is the average price borehole companies charge for their services in Zimbabwe, but this figure is subject to changes if conditions are different depending on the construction site.

Request A Quote:

If you have further questions, contact our friendly team today they will be more than happy to assist.

Phone: +263773898979
Chat via WhatsApp: https://wa.me/c/263773898979
avatar
Borehole Experts Online
Borehole Experts Zimbabwe Are Experts In The Design, Installation, Ongoing Maintenance and Emergency Repair of Borehole Pumps, Providing Bespoke Solutions To Suit Your Requirements. We Are Able To Specify, Drill, Supply and Install Borehole Pumps As Well. Borehole Experts Sales
Connect via WhatsApp